Construction of 7 New Units in Wombourne

Works are underway on Wombourne Enterprise Park to redevelop a run-down section of the site, including demolition of an existing repurposed multi-let building and construction of 7 new units. The units of varying sizes include a Lidl supermarket, an industrial unit and other retail facilities. The project will be split into two phases to accommodate […]

Progress with Construction of New Workshop and Office Facility at Colworth Science Park

Construction of the workshop and office facility at Colworth Science Park is well underway. The project has made real progress with the steel frame, roofing and cladding completed. Curtain walling is currently being installed and is really giving the building that finishing touch. Internally, floor slabs have been poured to an outstanding quality, whilst internal […]

Construction of New Warehouse at Oxford Products in Witney

It’s great to be back on a site in Witney, this time to provide additional storage for Oxford Products. As a global supplier of motorcycle and bicycle aftermarket products, Oxford Products is the UKs largest distributor of motorcycle parts and accessories. Works have commenced to construct a new warehouse adjoining one of their existing storage […]

Completion of 2 New Industrial Units in Exeter

At the end of last year, work was completed on Marsh Barton Industrial Estate, in Exeter, where Quantum constructed two new industrial units, with a combined floor area of 60,000ft² (5,500m²), whilst also refurbishing an adjacent building. Started in the summer of 2020 with demolition and enabling works, the project faced numerous challenges, not least […]

Commencement to Design and Construct 11 Industrial Units in Minworth near Birmingham

Quantum have commenced works on site in Minworth near Birmingham to construct 11 new industrial units with a floor area totalling circa 70,000ft² for Chancerygate.  The speculative units have been designed to provide flexible space for a variety of business types, whilst maintaining an attractive and quality finish.   Provided with a lobby area and mezzanine, the units are primed for adaptation by end […]

Commencement of CAT B Fit Out at Tamworth Logistics Park

We are pleased to have started work on a very local project to our offices in Tamworth.  Our client is growing their distribution capacity, having secured a newly built 320,000ft² warehouse on the Junction of the M42 and A5. Quantum is implementing the CAT B fit out to adapt the shell build to suit the new operations.  Along with works to the […]

Progress Update from The Grange, Rearsby

Construction of the two-story office building, linked to our client’s existing building in Rearsby, Leicestershire has progressed very nicely over the past few months.  Internally, the building is now in its final second fix stage, whilst externally all windows, curtain walling and brise soleil has been completed.   Due to the social distancing measures implemented on site in relation to Covid 19, and […]

Refurbishment works start on Toybox in Croydon

Work has commenced at Trojan Way in Croydon to refurbish a former Toys R Us retail unit. The landlord works for Quantum consist of stripping the original roof and replacing with a new built up cladding system.  The 51,000ft² (4,700m²) unit is currently empty but will become occupied by Amazon for storage and distribution.   Further refurbishment works will be undertaken by another contractor with some […]

Refurbishment of Retail Unit & Construction of 2 new Retail Pods in High Wycombe

Quantum have started work at London Road in High Wycombe to strip back and refurbish an existing retail unit, previously used by Homebase.   The project also incorporates the construction of 2 new retail pods on the same site and alterations to the car parking area. The existing unit of 27,000 ft² (2500 m²) will […]